Presentation + Paper
25 August 2022 Costs and benefits of automation for astronomical facilities
A. Yanes-Díaz, S. Rueda-Teruel, R. Bello, D. Lozano-Pérez, M. Royo-Navarro, T. Civera, M. Domínguez-Martínez, N. Martínez-Olivar, S. Chueca, C. Iñiguez García, A. Marín-Franch, F. Rueda-Teruel, G. López-Alegre, S. Bielsa, J. Muñoz-Maudos, H. Rueda-Asensio, A. Muñoz-Teruel, D. Garcés-Cubel, I. Soriano-Laguía, M. Almarcegui-Gracia, A. J. Cenarro, M. Moles, D. Cristobal-Hornillos, J. Varela, A. Ederoclite, H. Vázquez Ramió, M.C. Díaz-Martín, R. Iglesias-Marzoa, J. Castillo, A, López-Sainz, J. Hernández-Fuertes, D. Muniesa-Gallardo, A. Moreno-Signes, A. Hernán-Caballero, C. López-Sanjuan, A. del Pino, M. Akhlaghi, I. Pintos-Castro, J. Fernández-Ontiveros, F. Hernández-Pérez, S. Pyrzas, R. Infante-Sainz, T. Kuutma, D. Lumbreras-Calle, N. Maicas-Sacristan, J. Lamadrid-Gutierrez, F. López-Martinez, P. Galindo-Guil, E. Lacruz-Calderón, L. Valdivielso-Casas, M. Aguilar-Martín, S. Eskandarlou, A. Domínguez-Fernández, F. Arizo-Borillo, S. Vaquero-Valer, I. Muñoz-Igado, M. Alegre-Sánchez, G. Julián-Caballero de España, A. Romero, D. Casinos-Cardo
Author Affiliations +
Abstract
The Observatorio Astrofísico de Javalambre (OAJ†1 ) in Spain is a young astronomical facility, conceived and developed from the beginning as a fully automated observatory with the main goal of optimizing the processes in the scientific and general operation of the Observatory. The OAJ has been particularly conceived for carrying out large sky surveys with two unprecedented telescopes of unusually large fields of view (FoV): the JST/T250, a 2.55m telescope of 3deg field of view, and the JAST/T80, an 83cm telescope of 2deg field of view. The most immediate objective of the two telescopes for the next years is carrying out two unique photometric surveys of several thousands square degrees, J-PAS†2 and J-PLUS†3 , each of them with a wide range of scientific applications, like e.g. large structure cosmology and Dark Energy, galaxy evolution, supernovae, Milky Way structure, exoplanets, among many others. To do that, JST and JAST are equipped with panoramic cameras under development within the J-PAS collaboration, JPCam and T80Cam respectively, which make use of large format (~ 10k x 10k) CCDs covering the entire focal plane. This paper describes in detail, from operations point of view, a comparison between the detailed cost of the global automation of the Observatory and the standard automation cost for astronomical facilities, in reference to the total investment and highlighting all benefits obtained from this approach and difficulties encountered. The paper also describes the engineering development of the overall facilities and infrastructures for the fully automated observatory and a global overview of current status, pinpointing lessons learned in order to boost observatory operations performance, achieving scientific targets, maintaining quality requirements, but also minimizing operation cost and human resources.
Conference Presentation
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
A. Yanes-Díaz, S. Rueda-Teruel, R. Bello, D. Lozano-Pérez, M. Royo-Navarro, T. Civera, M. Domínguez-Martínez, N. Martínez-Olivar, S. Chueca, C. Iñiguez García, A. Marín-Franch, F. Rueda-Teruel, G. López-Alegre, S. Bielsa, J. Muñoz-Maudos, H. Rueda-Asensio, A. Muñoz-Teruel, D. Garcés-Cubel, I. Soriano-Laguía, M. Almarcegui-Gracia, A. J. Cenarro, M. Moles, D. Cristobal-Hornillos, J. Varela, A. Ederoclite, H. Vázquez Ramió, M.C. Díaz-Martín, R. Iglesias-Marzoa, J. Castillo, A, López-Sainz, J. Hernández-Fuertes, D. Muniesa-Gallardo, A. Moreno-Signes, A. Hernán-Caballero, C. López-Sanjuan, A. del Pino, M. Akhlaghi, I. Pintos-Castro, J. Fernández-Ontiveros, F. Hernández-Pérez, S. Pyrzas, R. Infante-Sainz, T. Kuutma, D. Lumbreras-Calle, N. Maicas-Sacristan, J. Lamadrid-Gutierrez, F. López-Martinez, P. Galindo-Guil, E. Lacruz-Calderón, L. Valdivielso-Casas, M. Aguilar-Martín, S. Eskandarlou, A. Domínguez-Fernández, F. Arizo-Borillo, S. Vaquero-Valer, I. Muñoz-Igado, M. Alegre-Sánchez, G. Julián-Caballero de España, A. Romero, and D. Casinos-Cardo "Costs and benefits of automation for astronomical facilities", Proc. SPIE 12186, Observatory Operations: Strategies, Processes, and Systems IX, 121860Y (25 August 2022); https://doi.org/10.1117/12.2626105
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Observatories

Control systems

Telescopes

Astronomy

Buildings

Control systems design

Systems modeling

Back to Top