The Giant Magellan Telescope (GMT), one of several next generation Extremely Large Telescopes (ELTs), is a 25.4 meter diameter altitude over azimuth design set to be built at the summit of Cerro Campánas at the Las Campánas Observatory in Chile. The paper describes the use of Building Information Modeling (BIM) for the GMT project.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Jose Teran, Michael Sheehan, Daniel H. Neff, David Adriaanse, Eric Grigel, and Arash Farahani "Building information modeling (BIM) approach to the GMT Project", Proc. SPIE 9145, Ground-based and Airborne Telescopes V, 91454M (22 July 2014); https://doi.org/10.1117/12.2055193
Lens.org Logo
CITATIONS
Cited by 2 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Data modeling

3D modeling

Systems modeling

Computer aided design

Document management

Telescopes

Space telescopes

RELATED CONTENT

LSST telescope modeling overview
Proceedings of SPIE (August 19 2016)
GMT software and controls overview
Proceedings of SPIE (September 24 2012)
Developing an observatory-wide engineering process
Proceedings of SPIE (June 30 2006)
Optimizing product life cycle processes in design phase
Proceedings of SPIE (February 11 2002)

Back to Top