KEYWORDS: Information fusion, 3D modeling, Bridges, Data modeling, Data processing, Visualization, Software engineering, Performance modeling, Nondestructive evaluation, Integration
Industrialized intelligent construction, as a new construction mode, gradually replaces the traditional construction mode and has attracted much attention. The prerequisite for the realization of intelligent construction is to realize the integration of engineering information in the three-dimensional model. Based on Dassault’s CATIA software, relying on the Yanchong Taizicheng cable-stayed bridge project, a steel box girder weld model was created, and the welds were numbered uniformly, and the weld information was integrated in the three-dimensional geometric model of the welds. The problem of scattered weld information is solved, and the visual management of weld information is realized. Lay the foundation for the full life cycle management of weld information.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.